COLDSTASH
VITROSTASH
Development of a new storage system to work within the industry standard storage containers yielding nearly double the storage capacity of cryopreserved embryos. The system is a cost effective way for labs to increase capacity within their existing space and infrastructure.
ETA DEVICES
IFR ENCLOSURES
Time sensitive design and production of five enclosures, each holding three PC boards at different elevations with floating rail mount systems and a a custom heat sink for the high power components. Design was completed using DXF files of PC Boards and over 30 documents detailing through-wall components and board competent dictating enclosure constraints and cooling requirements. Photorealistic renderings were generated for meetings before the first enclosures were delivered.
OASIS INC.
GLIDER BOX & TOWFISH
Ocean Acoustical Services and Instrumentation Systems, Inc. required specialized enclosures for underwater electronics. Final design and fabrication delivered on cost, on time, and on spec in support of a US Navy research contract in 2016.
Relativity
Rocket Shipping Fixtures
Relativity builds reusable rockets that make access to space more reliable and routine—empowering science, exploration, and innovation beyond our planet. They contracted Forgione Engineering about the need for a rocket fixture that would safely transport a rocket from California to Cape Canaveral, FL.
SECOND STAGE CHECKOUT QD ASSEMBLIES
Relativity builds reusable rockets that make access to space more reliable and routine—empowering science, exploration, and innovation beyond our planet. They contracted Forgione Engineering about a second stage checkout QD assembly for cryogenic liquid connection/disconnection during pre-launch operations.
ROCKET NOZZLE SUPPORT PLUGS
CAPE COD BUILDER
Falmouth House
A drilling rig was tipped over onto the Contoocook River in Peterborough New Hampshire, causing significant delays to the $8 million bridge project on U.S. Route 202. Forgione Engineering, Inc. was tasked with engineering the recovery and righting of the rig.
CAPE COD BUILDER
Eastham House
A drilling rig was tipped over onto the Contoocook River in Peterborough New Hampshire, causing significant delays to the $8 million bridge project on U.S. Route 202. Forgione Engineering, Inc. was tasked with engineering the recovery and righting of the rig.
BOSTON BUILDER
SOMERVILLE
A drilling rig was tipped over onto the Contoocook River in Peterborough New Hampshire, causing significant delays to the $8 million bridge project on U.S. Route 202. Forgione Engineering, Inc. was tasked with engineering the recovery and righting of the rig.
BOSTON BUILDER
PORTER SQUARE
A drilling rig was tipped over onto the Contoocook River in Peterborough New Hampshire, causing significant delays to the $8 million bridge project on U.S. Route 202. Forgione Engineering, Inc. was tasked with engineering the recovery and righting of the rig.
RISE ROBOTICS
BELTDRAULIC SUPERJAMMER ARM
An all-electric material handling unit that made a groundbreaking leap forward in performance, precision, and safety.
RISE ROBOTICS
ALUMINUM CRANE
Beltdraulic™ Common Lifting Device (CLD) is an electronic-free, manually operated, compact lift purpose built for hoisting critical components onboard the A/MC-130J or similar aircraft
RISE ROBOTICS
ALUMINUM CRANE
Beltdraulic™ Common Lifting Device (CLD) is an electronic-free, manually operated, compact lift purpose built for hoisting critical components onboard the A/MC-130J or similar aircraft